| Vertical Transportation Replacement
Vertical Transportation Replacement - LOS ANGELES INTERNATIONAL AIRPORT AVIATION
All Terminals

The objective of this project was to replace 88 elevators, 65 escalators, and 6 moving walks in two phases.  PBS conducted a detailed field survey of MEP dry utilities (power and telephone) infrastructure, service and distribution discovery, as well as a visual inspection to determine the condition of motors, controls and feeders for the vertical transportation systems. In addition, PBS developed options for power distribution, lighting, controls, fire and life safety, HVAC and plumbing system upgrades, and developed construction documents to support the upgrade of the elevators, escalators, and moving walks. 

Other Projects for HOK: